What is decommissioning in CSV?

In CSV, decommissioning is the retirement or controlled shutdown of an IT solution or computer system that is no longer needed. Learn more about this process here.
What is decommissioning in CSV - Quality by Design

Changes in business needs or technology are inevitable. They often lead to the retirement or “decommissioning” of computerized systems. ERP systems, for example, are often replaced if companies internationalize.

In this blog, you will learn why decommissioning usually occurs and what steps to take if you need to decommission your automated system. 

Phases of the computerized system life cycle

Before we talk about decommissioning, let’s look at the life cycle phases of a computerized system. Why? Because the decommissioning process happens during a specific phase of this life cycle.

According to GAMP, the life cycle of a computerized system includes all activities from initial conception to retirement. The life cycle of any system consists of 4 major phases:

  1. Concept
  2. Project
  3. Operation
  4. Retirement

Figure 1 – Phases of the computerized system life cycle

1. Concept phase

During the concept phase, the company looks at opportunities to automate one or more business processes based on business needs and benefits. Typically, during this phase, initial requirements are developed, and potential solutions are considered.

2. Project phase

The project phase includes planning, supplier assessment and selection, various levels of specification, configuration, and verification leading to acceptance and release for operation.

3. System operation

Typically, system operation is the longest phase and is managed using well-defined, up-to-date operational procedures applied by personnel with the appropriate education, training, and experience. Maintaining control, suitability for intended use, and compliance are key aspects.

4. Retirement of the system

The final phase is the final retirement of the system. It involves decisions about data retention, migration, or destruction, and the management of these processes.

Decommissioning takes place in this phase of the computerized system cycle life. The Retirement phase includes system withdrawal, system decommissioning, system disposal, and migration of required data.

Decommissioning: definition and purpose

In other terms, “decommissioning” is

  • the removal from an active state
  • the retirement of an IT solution, or computerized system that is no longer required
  • the controlled shutdown of a retired system.

The purpose of the Decommissioning Phase is to retire the computerized system.

Usually, this type of analysis is carried out on a day-to-day operation of the system, for example, if the system is no longer functional, or is already obsolete, but also as part of the validated system status maintenance result.

The result of the Decommissioning Phase is the deliberate and systematic decommissioning of the computerized system, with attention to data archiving and security, migration of data or functionality to a new solution.

Decommissioning activities are planned and executed with input from various stakeholder groups, including the solution development team, validation team, operations, and maintenance, legal, security, enterprise architecture, and interconnection systems.

A complete guide to Computer System Validation

This +100 page guide aims to bring context and define the necessary and appropriate strategies for the validation of computerized systems for Pharmaceutical Industries, Biologics, Biotechnology, Blood Products, Medicinal Products, and Medical Devices, used in activities related to compliance with Good Practices (GxP). Download it now  for free:

FREE E-BOOK

Common activities during the Decommissioning phase

Now, let’s look at some common activities that take place in the Decommissioning phase:

  • Develop a Decommission Plan
  • Remove User Access and Terminate Operations
  • Archive/Migrate Data Records (Data migration plan and report)
  • Archive Software Components and Documentation
  • Reallocate or Dispose of Hardware if any
  • Create the Post Decommission Report

Figure 2 – System Decommissioning Process

General rules when decommissioning a computer system

Some that can be followed when decommissioning a computer system should also be considered:

  • Rule 1: A computerized system can be retired from active use when it has been determined that a system is no longer required or appropriate for the function it is currently performing, or when a new system should be implemented to carry out the required processes.
  • Rule 2: A Retirement Plan must be written and approved to address the activities to follow for retiring the system.
  • Rule 3: A Retirement Report must be written and approved to describe all performed activities related to system retirement
  • Rule 4: Following approval of the Retirement Plan, the users of the system must be notified of the date on which the system will no longer be available.
  • Rule 5: If it is applicable a Data Migration Plan must be written and approved before the retirement system plan.
  • Rule 6: If it is applicable Data Migration Report must be written and approved describing all the activities followed for the correct and secure data migration.

Prepare the decommissioning of your computerized systems carefully

In short, the decommissioning phase marks the end of the computerized system lifecycle. Thus, a decommissioning plan needs to be prepared and executed to cover all facets of archiving, transferring, and disposing of the system’s software and hardware components.

Emphasis should be placed on the adequate preservation of data processed by the system so that it can be effectively migrated to another system or archived in accordance with applicable regulations and records management policies, with a view to possible future access. 

 Do you need help decommissioning an automated system? Or do you need support in creating a Decommissioning Plan? Or a data migration plan? Then don’t hesitate to contact us. We will be happy to help you!

Expert knowledge in Computer Systems Validation

Our validation solution guarantees maximum return on investment. Check our off-the-shelf validation solution for you.

Did you find this article interesting? Thanks for sharing it with your network:

Subscribe to the Blog
Here you will find interesting articles and news related to your industry.

Table of Contents

Stay up to date with life sciences insights

Come visit our booth at CPHI Barcelona 2023

Come to see the QbD Group at stand #3G73 at CPHI Conference in Barcelona. And after the conference…Eat & Connect with lifescience professionals at our QbD’s CPHI Networking Drink.